S 2229Energy Efficiency

Education - School Funds and Property

This bill requires all Rhode Island schools to be "zero energy capable" by 2037 and provides extra funding for compliance.

Introduced
Population
Affected
72
Introduced Jan 23, 2026Committee Senate Finance

Plain-English Summary

This legislation mandates that by December 31, 2037, all public school buildings in Rhode Island must meet "zero energy capable" standards. The Department of Education and Office of Energy Resources are directed to adopt specific regulations by June 2027 to achieve this goal. The bill defines zero energy capability as a state where the energy a school uses is equal to or less than the renewable energy generated on or off-site. To support this transition, the state will provide a 10% increase in housing aid reimbursement for school construction projects that meet these new energy efficiency standards.

For younger readers

This new law creates a big goal for all the school buildings in Rhode Island. By the year 2037, every school needs to be "zero energy capable." This means the school buildings have to be built or fixed up so they use very little energy, and the energy they do use comes from clean sources like the sun. The state government will give extra money to the towns to help pay for these special green improvements. The law also creates a job for a person to help teach builders how to make the schools eco-friendly.

Who & Where It Applies

Impacted groups
Students and TeachersSchool CommitteesLocal TaxpayersConstruction ContractorsArchitects and Engineers
Impacted communities
All

Constitutional & Fiscal Check

None Likely

Estimated cost
Amount unknown
Estimated revenue
None

Bill Analysis

Both viewpoints
For Progressives
  • Significantly advances environmental justice and climate action by mandating the decarbonization of public infrastructure across the entire state school system.
  • Increases state financial support for public education by offering a 10% bonus in housing aid reimbursement, incentivizing investment in modern, healthy learning environments.
  • Reduces long-term utility costs for school districts, potentially freeing up future operating budgets to be spent on students and teachers rather than electricity and heating.
  • The 2037 deadline may be viewed as too distant to address the immediate urgency of the climate crisis.
  • Could potentially widen inequality if wealthier districts can afford the initial upfront capital to pursue these projects and capture the bonus aid more easily than distressed communities.
  • Without full funding for the initial construction costs, the mandate could place strain on municipal budgets in lower-income areas, diverting funds from other social services.
For Conservatives
  • Encourages fiscal responsibility by aiming to drastically reduce or eliminate ongoing utility expenses for school districts, saving taxpayer money in the long run.
  • Promotes the utilization of federal tax credits and funding sources, ensuring Rhode Island taxpayers get a return on their federal tax dollars.
  • Allows local education agencies flexibility to pursue various funding sources without being penalized by a reduction in state housing aid.
  • Imposes a strict, heavy-handed government mandate on local communities regarding how they must build and renovate their own schools.
  • Expands the state bureaucracy by requiring the hiring of new staff within the School Building Authority to oversee compliance and training.
  • Likely increases the upfront cost of construction projects significantly to meet "zero energy" standards, potentially burdening taxpayers before savings are realized.

Votes

Loading votes...

Full Bill Text

Changes to existing Rhode Island law · 64 additions · 3 deletions

SECTION 1. Chapter 16-9 of the General Laws entitled "School Funds and Property" is hereby amended by adding thereto the following section: 16-9-11. New school construction and renovations. Not later than June 30, 2027, the department of education and the office of energy resources are hereby authorized and directed to develop and adopt regulations requiring all school buildings to meet the latest Northeast Collaborative for High Performance Schools (NE-CHPS) standard of zero energy capable, as required by 200-RICR-20-05-04.5.1B, and defined in § 16-7-36, by December 31, 2037.

(1) The regulations shall allow flexibility to the furthest extent possible for local education agencies to pursue state and federal funding sources that assist in financing energy efficiency or renewable energy systems without any penalties or reduction in state housing aid provided by the department of education.

(2) Furthermore, for local education agencies that pursue federal funding for renewable energy systems, the department’s regulations shall direct and provide further guidance to local education agencies to build, own, and operate solar panels utilizing federal guidance established in the Internal Revenue Code, 26 U.S.C. § 6417.

SECTION 2. Sections 16-7-36, 16-7-39, 16-7-40 and 16-7-41.1 of the General Laws in Chapter 16-7 entitled "Foundation Level School Support [See Title 16 Chapter 97 — The Rhode Island Board of Education Act]" are hereby amended to read as follows: 16-7-36. Definitions. The following words and phrases used in §§ 16-7-35 to 16-7-47 and in § 16-9-11 have the following meanings:

(1) “Adjusted equalized weighted assessed valuation” means the equalized weighted assessed valuation for a community as determined by the division of property valuation within the department of revenue in accordance with § 16-7-21; provided, however, that in the case of a regional school district the commissioner of elementary and secondary education shall apportion the adjusted equalized weighted assessed valuation of the member cities or towns among the regional school district and the member cities or towns according to the proportion that the number of pupils of the regional school district bears to the number of pupils of the member cities or towns.

(2) “Approved project” means a project which has complied with the administrative regulations governing §§ 16-7-35 through 16-7-47, and which has been authorized to receive state school housing reimbursement by the commissioner of elementary and secondary education.

(3) “Commissioning agent” means a person or entity who ensures that systems are designed, installed, functionally tested, and capable of being operated and maintained to perform in conformity with the design intent of a project.

(4) “Community” means any city, town, or regional school district established pursuant to law; provided, however, that the member towns of the Chariho regional high school district, created by P.L. 1958, ch. 55, as amended, shall constitute separate and individual communities for the purposes of distributing the foundation level school support for school housing for all grades financed in whole or in part by the towns irrespective of any regionalization.

(5) “Facilities condition index” means the cost to fully repair the building divided by the cost to replace the building as determined by the school building authority.

(6) “Functional utilization” means the ratio of the student population within a school facility to the capacity of the school facility to adequately serve students as defined by the school building authority.

(7) “Maintenance expenditures” means amounts spent for repairs or replacements for the purpose of keeping a school facility open and safe for use, including repairs, maintenance, and replacements to a school facility’s heating, lighting, ventilation, security, and other fixtures to keep the facility or fixtures in effective working condition. Maintenance shall not include contracted or direct custodial or janitorial services, expenditures for the cleaning of a school facility or its fixtures, the care and upkeep of grounds, recreational facilities, or parking lots, or the cleaning of or repairs and replacements to movable furnishings or equipment.

(8) “Owner’s program manager” means owner’s program manager as defined in § 37-2-7.

(9) “Prime contractor” means the construction contractor who is responsible for the completion of a project.

(10) “Reference year” means the year next prior to the school year immediately preceding that in which aid is to be paid.

(11) “Subject to inflation” means the base amount multiplied by the percentage of increase in the Producer Price Index (PPI) Data for Nonresidential Building Construction (NAICS 236222) as published by the United States Department of Labor, Bureau of Labor Statistics determined as of September 30 of the prior calendar year.

(12) "Zero energy capable" means the building:

(i) Meets the latest Northeast Collaborative for High Performance Schools (NE-CHPS) standard of a zero energy capable school building whereby the actual annual energy delivered other than as described in subsection (12)(ii) of this section, must be less than or equal to the renewable energy generated onsite; or

(ii) The actual annual energy delivered must be less than or equal to the sum of:

(A) The renewable energy generated onsite;

(B) The renewable energy generated offsite through a power purchase agreement; and

(C) The value of purchased NE-GIS certificates that meet the standard for a new renewable energy resources as defined in § 39-26-2. 16-7-39. Computation of school housing-aid ratio. For each community, the percent of state aid for school housing costs shall be computed in the following manner:

(1) The adjusted equalized weighted assessed valuation for the district is divided by the resident average daily membership for the district (grades twelve (12) and below); (2) The adjusted equalized weighted assessed valuation for the state is divided by the resident average daily membership for the state (grades twelve (12) and below); (1) is then divided by (2) and the resultant ratio is multiplied by a factor currently set at sixty-two percent (62%) which represents the approximate average district share of school support; the resulting product is then subtracted from one hundred percent (100%) to yield the housing aid share ratio, provided that in no case shall the ratio be less than thirty percent (30%). Provided, that effective July 1, 2010, and annually at the start of each fiscal year thereafter, the thirty percent (30%) floor on said housing-aid share shall be increased by five percent (5%) increments each year until said floor on the housing-aid share ratio reaches a minimum of not less than forty percent (40%). This provision shall apply only to school housing projects completed after June 30, 2010, that received approval from the board of regents prior to June 30, 2012. Provided further, for the fiscal year beginning July 1, 2012, and for subsequent fiscal years, the minimum housing aid share shall be thirty-five percent (35%) for all projects receiving council on elementary and secondary education approval after June 30, 2012. The resident average daily membership shall be determined in accordance with § 16-7-22(1).

(2) No district shall receive a combined total of more than twenty (20) incentive percentage points for projects that commence construction by June 30, 2024, and five (5) incentive points for projects that commence construction thereafter; provided further, these caps shall be in addition to amounts received under §§ 16-7-40(a)(1) and, 16-7-40(a)(2), 16-7-40(j)(1) and 16-7-40(j)(2). Furthermore, a district’s share shall not be decreased by more than half of its regular share irrespective of the number of incentive points received nor shall a district’s state share increase by more than half of its regular share, including amounts received under §§ 16-7-40(a)(1) and 16-7- 40(a)(2), irrespective of the number of incentive points received. Provided further that the aforementioned limit on the state share increasing by more than half of its regular share shall not apply to projects submitted for reimbursement after July 1, 2023. 16-7-40. Increased school housing ratio. (a)(1) In the case of regional school districts, the school housing aid ratio shall be increased by two percent (2%) for each grade so consolidated.

(2) Regional school districts undertaking renovation project(s) shall receive an increased share ratio of four percent (4%) for those specific project(s) only, in addition to the combined share ratio calculated in § 16-7-39 and this subsection.

(b) In the case of projects undertaken by districts specifically for the purposes of school safety and security, the school housing aid share ratio shall be increased by five percent (5%) for these specific projects only, in the calculation of school housing aid. The increased share ratio shall continue to be applied for as long as the project(s) receives state housing aid. In order to qualify for the increased share ratio, seventy-five percent (75%) of the project costs must be specifically directed to school safety and security measures. The council on elementary and secondary education shall promulgate rules and regulations for the administration and operation of this section.

(c) For purposes of addressing health and safety deficiencies as defined by the school building authority, including the remediation of hazardous materials, the school housing aid ratio shall be increased by five percent (5%) so long as the construction of the project commences by June 30, 2024, is completed by June 30, 2029, and a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

(d) For purposes of educational enhancement, including projects devoted to the enhancement of early childhood education and career and technical education, the school housing aid ratio shall be increased by five percent (5%) so long as construction of the project commences by June 30, 2024, is completed by June 30, 2029, and a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000) must be specifically directed to these purposes.

(e) For replacement of a facility that has a facilities condition index of sixty-five percent (65%) or higher, the school housing ratio shall be increased by five percent (5%) so long as construction of the project commences by June 30, 2024, is completed by June 30, 2029, does not receive a bonus pursuant to subsection (f) or subsection (g), and a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

(f) For any new construction or renovation that increases the functional utilization of any facility from less than sixty percent (60%) to more than eighty percent (80%), including the consolidation of school buildings within or across districts, the school housing aid ratio shall be increased by five percent (5%) so long as construction of the project commences by June 30, 2024, is completed by June 30, 2029, and a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

(g) For any new construction or renovation that decreases the functional utilization of any facility from more than one hundred twenty percent (120%) to between eighty-five percent (85%) to one hundred five percent (105%), the school housing ratio shall be increased by five percent (5%) so long as construction of the project commences by June 30, 2024, is completed by June 30, 2029, and a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

(h) For consolidation of two (2) or more school buildings, within or across districts into one school building, the school housing aid ratio shall be increased by five percent (5%) so long as construction of the project commences by June 30, 2024, is completed by June 30, 2029, a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot, and does not receive a bonus pursuant to subsection (f) or subsection (g). In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

(i) Any regionalized and/or non-regionalized school district receiving an increased share ratio for a project approved prior to July 1, 2018, shall continue to receive the increased share ratio for as long as the project receives state housing aid. (j)(1) In the case of projects undertaken by districts specifically for the purposes of high- performance school design, the school housing aid share ratio shall be increased by five percent (5%) for these specific projects only, in the calculation of school housing aid. The increased share ratio shall continue to be applied for as long as the project(s) receives state housing aid. In order to qualify for the increased share ratio, seventy-five percent (75%) of the project costs shall be specifically directed to this purpose. The council on elementary and secondary education shall promulgate rules and regulations for the administration and operation of this section.

(2) For any new construction or renovation that includes energy efficiency and renewable energy upgrades for the building to meet the standard of zero energy capable school building pursuant to § 16-7-36(12), the school housing aid ratio shall be increased by ten percent (10%). 16-7-41.1. Eligibility for reimbursement.

(a) School districts, not municipalities, may apply for and obtain approval for a project under the necessity of school construction process set forth in the regulations of the council on elementary and secondary education, provided, however, in the case of a municipality that issues bonds through the Rhode Island health and educational building corporation to finance or refinance school facilities for a school district that is not part of the municipality, the municipality may apply for and obtain approval for a project. Such approval will remain valid until June 30 of the third fiscal year following the fiscal year in which the council on elementary and secondary education’s approval is granted. Only those projects undertaken at school facilities under the care and control of the school committee and located on school property may qualify for reimbursement under §§ 16-7-35 — 16-7-47. Facilities with combined school and municipal uses or facilities that are operated jointly with any other profit or nonprofit agency do not qualify for reimbursement under §§ 16-7-35 — 16-7-47. Projects completed by June 30 of a fiscal year are eligible for reimbursement in the following fiscal year. A project for new school housing or additional housing shall be deemed to be completed when the work has been officially accepted by the school committee or when the housing is occupied for its intended use by the school committee, whichever is earlier.

(b) Notwithstanding the provisions of this section, the board of regents shall not grant final approval for any project between June 30, 2011, and May 1, 2015, except for projects that are necessitated by immediate health and safety reasons. In the event that a project is requested during the moratorium because of immediate health and safety reasons, those proposals shall be reported to the chairs of the house and senate finance committees.

(c) Any project approval granted prior to the adoption of the school construction regulations in 2007, and which are currently inactive; and any project approval granted prior to the adoption of the school construction regulations in 2007 which did not receive voter approval or which has not been previously financed, are no longer eligible for reimbursement under this chapter. The department of elementary and secondary education shall develop recommendations for further cost containment strategies in the school housing aid program.

(d) Beginning July 1, 2015, the council on elementary and secondary education shall approve new necessity of school construction applications on an annual basis. The department of elementary and secondary education shall develop an annual application timeline for local education agencies seeking new necessity of school construction approvals.

(e) Beginning July 1, 2019, no state funding shall be provided for projects in excess of ten million dollars ($10,000,000) unless the prime contractor for the project has received prequalification from the school building authority.

(f) Beginning July 1, 2019, the necessity of school construction process set forth in the regulations of the council on elementary and secondary education shall include a single statewide process, developed with the consultation of the department of environmental management, that will ensure community involvement throughout the investigation and remediation of contaminated building sites for possible reuse as the location of a school. That process will fulfill all provisions of § 23-19.14-5 related to the investigation of reuse of such sites for schools.

(g) Beginning July 1, 2019, school housing projects exceeding one million five hundred thousand dollars ($1,500,000) subject to inflation shall include an owner’s program manager and a commissioning agent. The cost of the program manager and commissioning agent shall be considered a project cost eligible for aid pursuant to §§ 16-7-41 and 16-105-5.

(h) Temporary housing, or swing space, for students shall be a reimbursable expense so long as a district can demonstrate that no other viable option to temporarily house students exists and provided that use of the temporary space is time limited for a period not to exceed twenty-four

(24) months and tied to a specific construction project.

(i) Environmental site remediation, as defined by the school building authority, shall be a reimbursable expense up to one million dollars ($1,000,000) per project.

(j) If, within thirty (30) years of construction, a newly constructed school is sold to a private entity, the state shall receive a portion of the sale proceeds equal to that project’s housing aid reimbursement rate at the time of project completion.

(k) All projects must comply with § 37-13-6, ensuring that prevailing wage laws are being followed, and § 37-14.1-6, ensuring that minority business enterprises reach the required minimum participation, and § 37-13-3.1, ensuring apprenticeship program utilization.

(l) Using reviewable criteria, all projects seeking school housing aid shall complete an independent, objective, reasoned study on all projects over ten million dollars ($10,000,000) to determine whether adoption of a project labor agreement on the proposed project or projects will help achieve the goals of the state purchases act.

SECTION 3. Section 16-105-3 of the General Laws in Chapter 16-105 entitled "School Building Authority" is hereby amended to read as follows: 16-105-3. Roles and responsibilities. The school building authority roles and responsibilities shall include:

(1) Management of a system with the goal of ensuring equitable and adequate school housing for all public school children in the state;

(2) Prevention of the cost of school housing from interfering with the effective operation of the schools;

(3) Management of school housing aid in accordance with statute;

(4) Reviewing and making recommendations to the council on elementary and secondary education on necessity of school construction applications for state school housing aid and the school building authority capital fund, based on the recommendations of the school building authority advisory board;

(5) Promulgating, managing, and maintaining school construction regulations, standards, and guidelines applicable to the school housing program, based on the recommendations of the school building authority advisory board, created in § 16-105-8. Said regulations shall require conformance with the minority business enterprise requirements set forth in § 37-14.1-6 and with the latest Northeast Collaborative for High Performance Schools (NE-CHPS) standards or equivalent, contingent on approval from the council on elementary and secondary education;

(6) Developing a prequalification and review process for prime contractors, architects, and engineers seeking to bid on projects in excess of ten million dollars ($10,000,000) in total costs subject to inflation. Notwithstanding any general laws to the contrary, a prequalification shall be valid for a maximum of two (2) years from the date of issuance. Factors to be considered by the school building authority in granting a prequalification to prime contractors shall include, but not be limited to, the contractor’s history of completing complex projects on time and on budget, track record of compliance with applicable environmental and safety regulations, evidence that completed prior projects prioritized the facility’s future maintainability, and compliance with applicable requirements for the use of women and minority owned subcontractors;

(i) At least annually, a list of prequalified contractors, architects, and engineers shall be publicly posted with all other program information;

(7) Providing technical assistance and guidance to school districts on the necessity of school construction application process;

(8) Providing technical advice and assistance, training, and education to cities, towns, and/or local education agencies and to general contractors, subcontractors, construction or project managers, designers and others in planning, maintenance, and establishment of school facility space;

(9) Developing a project priority system, based on the recommendations of the school building authority advisory board, in accordance with school construction regulations for the school building authority capital fund, subject to review and, if necessary, to be revised on intervals not to exceed five (5) years. Project priorities shall include, but not be limited to, the following order of priorities:

(i) Projects to replace or renovate a building that is structurally unsound or otherwise in a condition seriously jeopardizing the health and safety of school children where no alternative exists;

(ii) Projects needed to prevent loss of accreditation;

(iii) Projects needed for the replacement, renovation, or modernization of the HVAC system in any schoolhouse to increase energy conservation and decrease energy-related costs in said schoolhouse;

(iv) Projects needed to replace or add to obsolete buildings in order to provide for a full range of programs consistent with state and approved local requirements; and

(v) Projects needed to comply with mandatory, instructional programs;

(10) Maintaining a current list of requested school projects and the priority given them;

(11) Collecting and maintaining readily available data on all the public school facilities in the state;

(12) Collecting, maintaining, and making publicly available quarterly progress reports of all ongoing school construction projects that shall include, at a minimum, the costs of the project and the time schedule of the project;

(13) Recommending policies and procedures designed to reduce borrowing for school construction programs at both state and local levels;

(14) At least every five (5) years, conducting a needs survey to ascertain the capital construction, reconstruction, maintenance, and other capital needs for schools in each district of the state, including public charter schools. Beginning in 2026, this needs survey shall include progress towards and recommendations for energy efficiency and renewable energy upgrades to bring all state school buildings to the definition of a zero energy capable school building pursuant to § 16- 7-36;

(15) Developing a formal enrollment projection model or using projection models already available;

(16) Encouraging local education agencies to investigate opportunities for the maximum utilization of space in and around the district;

(17) Collecting and maintaining a clearinghouse of prototypical school plans that may be consulted by eligible applicants;

(18) Retaining the services of consultants, as necessary, to effectuate the roles and responsibilities listed within this section;

(19) Hiring an appropriate staff member who shall create and implement a plan to bring all Rhode Island school buildings in compliance with the standard of a zero energy capable school building pursuant to § 16-7-36 and who shall provide technical advice and assistance, training, and education to cities, towns, and/or local education agencies, and to general contractors, subcontractors, construction or project managers, designers and others on the latest NE-CHPS standards; and (19)(20) No district shall receive a combined total of more than twenty (20) incentive percentage points for projects that commence construction by December 30, 2023, and five (5) incentive points for projects that commence construction thereafter; provided further, these caps shall be in addition to amounts received under §§ 16-7-40(a)(1) and, 16-7-40(a)(2), 16-7-40(j)(1), and 16-7-40(j)(2). Furthermore, a district’s share shall not be decreased by more than half of its regular share irrespective of the number of incentive points received, nor shall a district’s state share increase by more than half of its regular share, including amounts received under §§ 16-7- 40(a)(1) and 16-7-40(a)(2), irrespective of the number of incentive points received. Notwithstanding any provision of the general laws to the contrary, the reimbursement or aid received under this chapter or chapter 38.2 of title 45 shall not exceed one hundred percent (100%) of the sum of the total project costs plus interest costs. If a two hundred and fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot, projects approved between May 1, 2015, and January 1, 2018, are eligible to receive incentive points (above and beyond what the project was awarded at the time of approval) pursuant to § 16-7-39 and § 16- 7-40. Provided, however, any project approved during this time period with a project cost in excess of one million five hundred thousand dollars ($1,500,000), which does not include an owner’s program manager and a commissioning agent, shall only be eligible to receive five (5) incentive points. Incentive points awarded pursuant to the provisions of this subsection shall only be applied to reimbursements occurring on or after July 1, 2018. Any project approved between May 1, 2015, and January 1, 2018, that is withdrawn and/or resubmitted for approval shall not be eligible for any incentive points.

SECTION 4. This act shall take effect upon passage.